Project

Bathroom renovation in Muswell Hill, N10

The old bathroom was quite outdated, although still reasonably in good condition. Importantly it was quite a big room - a big bath, shower toilet and basin, chest of drawers fitted easily and there was quite a big floor space still available.

Although I am not a fan of traditional look, this bathroom is one of my favourite. The customers did a quite a research in selecting and sourcing the bathroom sanitary units. The bath tub, chest of drawers and decorative panelling are painted in the same brand paint colour. I would imagine it didn't come cheap, but it was worth it - this bathroom looks really consistent, all the fittings and colours match and fit in their spaces properly. The engineered wood flooring makes a sharp contrast which enhances the look of other finishes. There is one issue with this type of the flooring in the bathroom - it will require maintenance and care: no water puddles can be left on it. In that same property we also renovated their loft bathroom and replaced an immersion cylinder, water pump.

Below - images of how this bathroom looked before us.

Project Details

  • Project costs: around £3500
  • Completion Date: August 2014
  • Duration: 3 weeks
  • Project type: Bathroom renovation

Related Projects